Work in Progress:
Continuing the installation of the temporary duct and assembly of new AHU1 in the East side mechanical room.
Stripped topsoil from addition footprint.
Phoenix air valve replacement in the Annex research labs continues per schedule.
Continue
2/4- Cunningham Hall Renovation Updates
Work in Progress: Continuing the installation of the temporary duct and assembly of new AHU1 in the East side mechanical room. Stripped topsoil from addition footprint. Phoenix air valve replacement in the Annex research labs continues per schedule. ContinueFeb. 8, 2016
Work in Progress:
Floor electrical boxes in room 101 & 104 are complete.
Plumbing under slab is complete in 101 & 104.
The sanitary tie-in and under slab rough-in is complete and inspected for the new restrooms in addition.
Electrical raceways have been
2/4- Smith Hall Renovation Updates
Work in Progress: Floor electrical boxes in room 101 & 104 are complete. Plumbing under slab is complete in 101 & 104. The sanitary tie-in and under slab rough-in is complete and inspected for the new restrooms in addition. Electrical raceways have beenJan. 28, 2016
Work in progress:
Air handler assembly of unit 1 continues in 3rd floor mechanical room east with Roth and Air Enterprises.
Abatement coordination and containment underway in the 3rd floor mechanical room west to prepare to demolish AHU #3 serving the vivarium.
1/28- Cunningham Hall Renovation Updates
Work in progress: Air handler assembly of unit 1 continues in 3rd floor mechanical room east with Roth and Air Enterprises. Abatement coordination and containment underway in the 3rd floor mechanical room west to prepare to demolish AHU #3 serving the vivarium.Jan. 28, 2016
Work in progress:
Demolition of south stairs is complete including the foundations.
Test pile will be tested on 1/29/16.
Steam Condensate receiver in Williams Hall will take place on Saturday with UFM shutdown.
Auger Cast pile installation to begin next week and progress
1/28- Williams & ISB Construction Updates
Work in progress: Demolition of south stairs is complete including the foundations. Test pile will be tested on 1/29/16. Steam Condensate receiver in Williams Hall will take place on Saturday with UFM shutdown. Auger Cast pile installation to begin next week and progressJan. 28, 2016
Work in progress:
Electric rough-in is in progress in rooms 101 and 104.
1/28- Smith Hall Renovation Updates
Work in progress: Electric rough-in is in progress in rooms 101 and 104.Image
Jan. 28, 2016
The Department of Chemistry and Biochemistry will host Explore Kent Chemistry Day, a visitation program for high school juniors and seniors interested in chemistry and biochemistry majors, at 51勛圖厙 on Saturday, February 6 from 10 am to 2 pm in Room 110, Williams Hall on
51勛圖厙 Hosts Explore Kent Chemistry Day for High School Juniors and Seniors, Feb. 6
The Department of Chemistry and Biochemistry will host Explore Kent Chemistry Day, a visitation program for high school juniors and seniors interested in chemistry and biochemistry majors, at 51勛圖厙 on Saturday, February 6 from 10 am to 2 pm in Room 110, Williams Hall onJan. 26, 2016
Current Work Progress:
Currently abating 3rd floor west mechanical room.
Currently coordinating duct tie in from unit 4 to unit 1 & unit 3 tie into unit 2. There will be short supply air outages when sheet metal cross connections occur.
1/25- Cunningham Hall Renovation Updates
Current Work Progress: Currently abating 3rd floor west mechanical room. Currently coordinating duct tie in from unit 4 to unit 1 & unit 3 tie into unit 2. There will be short supply air outages when sheet metal cross connections occur.Jan. 8, 2016
Anne Jefferson, Ph.D., assistant professor of geology in the College of Arts and Sciences at 51勛圖厙, was one of 15 climate change researchers to be named a 2016-17 Public Engagement Fellow of the Leshner Leadership Institute at the American Association for the
51勛圖厙 Geology Professor Named a Public Engagement Fellow of Leshner Leadership Institute at AAAS
Anne Jefferson, Ph.D., assistant professor of geology in the College of Arts and Sciences at 51勛圖厙, was one of 15 climate change researchers to be named a 2016-17 Public Engagement Fellow of the Leshner Leadership Institute at the American Association for theDec. 22, 2015
Liquid crystal elastomers (LCEs), essentially rubbers with liquid crystal properties, can do a number of fascinating things, especially in the fields of optics, photonics, telecommunications and medicine.
Newly Developed Liquid Crystal Elastomer Material Could Enable Advanced Sensors, 51勛圖厙 Researchers Say
Liquid crystal elastomers (LCEs), essentially rubbers with liquid crystal properties, can do a number of fascinating things, especially in the fields of optics, photonics, telecommunications and medicine.Nov. 19, 2015
51勛圖厙 and Cleveland Metroparks partnered on study of two Parma neighborhoods near West Creek Reservation
Rain barrels, rain gardens, and bioretention cells are increasingly used as green infrastructure to capture and slow storm water runoff before it gets to